Essential Winter Protection

Monument homeowners know that a hard freeze can hit earlier than in the lower-lying areas of Colorado Springs. If water is left in your pipes when the Tri-Lakes deep freeze arrives, it will shatter PVC lines and destroy expensive backflow preventers.

Springs Irrigation uses industrial high-volume, low-pressure compressed air to push every drop of moisture out of your zone mainlines and laterals, protecting your investment for next year.

Monument Blowout Checklist:

  • Mainline Blowout: High-volume air injection to clear primary supply lines.
  • Zone-by-Zone Clearing: Sequentially blowing out each zone until only mist remains.
  • Backflow Preparation: Testing and draining the backflow preventer to prevent frost damage.
  • Controller Winterization: Powering down or setting your controller to winter-pause mode.
  • Performance Audit: A quick visual check for any repair needs for the spring.

Reserve Your Date

Blowout slots in Monument fill up fast. Reserve your spot before the first hard freeze.

Prefer a faster response? (719) 414-8555 is the quickest way to reach us.

🔒 Priority scheduling for Monument residents.

The Cost of Skipping a Blowout

A simple blowout now prevents thousands in repairs in the spring.

01

Burst Mainlines

Frozen water expands with massive force, splitting PVC and poly piping throughout your yard.

02

Backflow Rupture

The backflow preventer is the most expensive single component of your system and easiest to crack.

03

Zone Valve Damage

Water trapped in valve housings often shatters the internal diaphragms and expensive casings.

04

Rural Lot Issues

Larger lots in Monument mean longer pipe runs. Any missed water can lead to multiple spring leaks.

Sprinkler Blowout & Winterization for Monument

Monument and Tri-Lakes properties can see higher-elevation weather swings, early freezes, larger lots, and varied terrain. Service planning should account for exposed lines, elevation changes, longer runs, and seasonal timing around Woodmoor, Kings Deer, and nearby neighborhoods.

Winterization should be scheduled before a hard freeze and completed zone by zone with regulated, high-volume air. The process should also account for backflow equipment, low spots, drip components, and any exposed portions of the system.

Call (719) 414-8555 Request Estimate